There is no quality plan
No ITP, no hold points, no acceptance criteria — every stage is accepted by agreement.
Project Management Services A8
Quality and safety are not the product of contractor goodwill but of a system: a plan, control points, inspections, recorded non-conformances and their closure.
How it is bought
We reply within 1 business day. A commercial proposal follows within 5 business days of the scoping meeting.
In substance
QA prevents defects — system, procedures, competence, quality plan. QC detects them — inspections, measurement, testing. Separating the two and running an ITP with defined hold points turns quality from a claim into a measurable process.
No ITP, no hold points, no acceptance criteria — every stage is accepted by agreement.
Defects are discussed verbally, there is no NCR register and closure is untracked.
Laboratory control is a formality and results are not tied to specific elements and batches.
Briefings are nominal, PPE is uncontrolled and violations carry no consequence.
A financing institution or foreign shareholder requires a demonstrable quality and HSE system.
Project quality plan and Inspection & Test Plan with hold points, acceptance criteria and responsible parties.
Inspections executed against the ITP, laboratory testing arranged, records maintained and tied to elements.
NCR register maintained, corrective actions assigned, closure tracked and root causes analysed.
Occupational, industrial and environmental safety requirements, regular site inspections and audits.
Induction and task briefings, toolbox talks, incident and near-miss reviews.
Deliverables
The specific documents, reports and management products that remain with the client.
Hold points sit before the moment when correction becomes expensive.
Every element is linked to its materials, tests and certificates.
Violations are found and closed; safety culture is measured rather than asserted.
The system withstands review by investors, lenders and regulators.
FAQ
Not answered here? Write to us and we will respond on your case.
QA is quality assurance — system, procedures, quality plan, personnel competence: preventing defects. QC is quality control — inspection, measurement and testing: detecting defects. A working system needs both.
An Inspection & Test Plan lists the control points for each work type with the inspection method, acceptance criteria, required records and responsible parties. It makes acceptance predictable for everyone involved.
Responsibility for its own workforce remains with the contractor. INVECON sets the project requirements, monitors compliance, records violations, enforces closure and stops work where violations are critical.
Certified experts: incoming, in-process and acceptance control, covered works, quantities.
Contractor and work-front coordination, schedule, cost, quality and HSE.
Project document control: single environment, revisions, workflows, as-builts.
Start-up readiness, commissioning, punch list, statutory handover.
Tell us about the asset and the current stage — we will propose a working format and team composition. A commercial proposal follows within five business days of the meeting.
We reply within 1 business day. A commercial proposal follows within 5 business days of the scoping meeting.