Site is working from different revisions
Drawings circulate by email and messenger and nobody can establish which revision is current.
Project Management Services A8
Handover is delayed by documents, not by works. We set up a common data environment in which the current revision, its approver and the remaining gaps are always clear.
How it is bought
We reply within 1 business day. A commercial proposal follows within 5 business days of the scoping meeting.
In substance
We work in Autodesk BIM 360 in line with ISO 19650: every document carries a unique code, a status, a revision and an approval route. That removes the situation where crews build to a superseded drawing.
Drawings circulate by email and messenger and nobody can establish which revision is current.
Certificates and logs are reconstructed retrospectively and part of the evidence is lost.
The approval route is informal and response times are uncontrolled.
Record drawings do not reflect what was actually installed.
BIM 360 structured to ISO 19650: document codes, statuses, access rights, templates.
Documentation register maintained, revisions controlled, superseded versions withdrawn, current versions distributed.
Formal routes and response times, with overdue items tracked.
Records maintained alongside the works, with completeness and accuracy verified.
Handover dossier structured, completed and transferred to the client and operations team.
Deliverables
The specific documents, reports and management products that remain with the client.
Superseded revisions are withdrawn and distribution is controlled.
Records are produced as work proceeds and are complete at acceptance.
For every document it is clear who approved which change and when.
Handover delivers a structured set rather than boxes of paper.
FAQ
Not answered here? Write to us and we will respond on your case.
It is the international standard for information management on construction projects, defining naming, statuses, revisions and exchange in a common data environment. In practice it removes the single largest source of error — building to superseded information.
Site records are certificates, logs, test reports and approvals: evidence of how the work was performed. As-builts are record drawings showing what was actually constructed. Acceptance requires both.
Yes. We start with an inventory of existing documentation and a gap assessment, then deploy the environment and rebuild completeness for the critical packages.
A digital project environment: dashboards, registers, automated reporting, AI tooling.
Start-up readiness, commissioning, punch list, statutory handover.
Quality assurance and control, occupational, industrial and environmental safety.
We manage the project on the owner's behalf — from the land plot to commissioning.
Tell us about the asset and the current stage — we will propose a working format and team composition. A commercial proposal follows within five business days of the meeting.
We reply within 1 business day. A commercial proposal follows within 5 business days of the scoping meeting.